An automotive supplier exhausted warm booth air while purchasing electric or gas heat for wash lines.

Source / inputs

Source: filtered exhaust air ~28–35°C equivalent. Sink: wash water 65–70°C. Duty: ~350 kW.

Heat pump solution

Air-to-water heat pump with glycol coil recovery and fouling-tolerant exchangers; weekend setback strategy.

COP & savings

Illustrative COP 3.0–3.6; strong when booth runs two shifts.

Investment / ROI notes

Payback often <4 years where electricity is competitive and booth runtime is high.